My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/09/2008
LOSALTOSHILLS
>
City Clerk
>
City Council Minutes
>
2008
>
10/09/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2014 4:01:24 PM
Creation date
10/31/2014 3:59:43 PM
Metadata
Fields
Template:
Minutes
Date
2008-10-09
Description
Regular Meeting Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPENED PUBLIC HEARING <br /> Eric Clow, resident, expressed his support for the project. <br /> CLOSED PUBLIC COMMENT <br /> Council thanked City Engineer Richard Chiu for his presentation. <br /> MOTION SECONDED AND CARRIED: Moved by Kerr, seconded by Warshawsky and <br /> passed unanimously to accept and file the Initial Study and to adopt the Mitigated <br /> Negative Declaration for the landscaping along Segment 2 within the Foothill College <br /> Pathway and construction of a bicycle and pedestrian pathway along El Monte Road <br /> between Foothill College Pathway entrance and Stonebrook Road (Segment 3). <br /> UNFINISHED BUSINESS <br /> 11. Update on Town Goals: <br /> Emergency Preparedness <br /> Council had before them on the dais, a draft letter to Santa Clara County Fire Chief Kurt <br /> Waldvogel thanking the Chief and crews for their efforts and excellent service during the <br /> fire season. <br /> There were no changes proffered or objections expressed by Council to the draft letter <br /> being mailed under the Mayor's signature. <br /> Environmental Initiatives <br /> No status report. <br /> Parks and Recreation Assets and Programs <br /> Mayor Mordo reported that resident John Vidovich had made a donation to the Town <br /> directed to the restoration of Westwind Community Barn. Mordo noted that Vidovich <br /> had expressed his support for the Barn and acknowledged the facility as a community <br /> asset. <br /> City Engineer/Public Works Director Richard Chiu provided a status report on the Little <br /> League Fields project that is currently under construction. The expectation was for the <br /> project to be completed by the end of the year. Chiu reported that the pre- <br /> constructed/engineered restroom building may take additional time given the lead time <br /> for manufacturing. <br /> Sewers and Infrastructure <br /> Councilmember O'Malley reported that the Ad Hoc Infrastructure Committee had made a <br /> presentation to the Standing Finance and Investment Committee at their last meeting. <br /> The discussion had been very informative. He was hopeful that several members of the <br /> FIC might have an interested in serving on the Infrastructure Committee, if the new <br /> • Council should have an interest in continuing the investigation of the expansion of the <br /> sewer system in Los Altos Hills. <br /> 5 City Council Regular Meeting Minutes <br /> October 9,2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.