Laserfiche WebLink
• • <br /> TO: Cyrus Kianpour <br /> 41;( <br /> f(�.i -. i 5 <br /> FROM: Ed Slintak <br /> Ot %IS" <br /> corj DATE: 11 December 2007 <br /> SUBJECT: Los Altos Hills, Segment 3 Pathway <br /> CSG Project No. LOSAL 07-051 <br /> Attached is the level of effort estimate for the subject project to complete plans, <br /> specifications and estimate. Scope of work includes: <br /> • Topographic survey <br /> • Conversion of the existing median into a pathway median similar to the segment to the <br /> east. Installation of ADA compliant ramps where necessary. <br /> • Construction of a new median island on the western side of the College Loop Road <br /> intersection. This median island will provide a pedestrian refuge on the eastern side and <br /> the western side will provide a location for installation of an entry monument sign. <br /> • Construction of a new sidewalk along the northern side of El Monte between Stonebrook <br /> Road and College Loop Road. New sidewalk may be constructed of AC, any retaining <br /> walls necessary shall be of wood construction. <br /> • Revise the two existing traffic signals at College Loop and Stonebrook intersections. <br /> Revisions to include addition of pedestrian phases as required, revisions to phase <br /> diagrams to accommodate new ped phases and revisions to poles and signal heads as <br /> required. <br /> • Landscape and irrigation design for the new median area(s) and landscape and irrigation <br /> for the Segment 2 pathway area through the Foothill College campus. <br /> ,1 <br /> Assumptions include: <br /> • Electronic versions of the construction plans for Segment 2 Pathway will be made <br /> available to use as base sheets for landscape design. <br /> • The Town will provide as-built plans for the two existing signal systems. As-built <br /> information to include existing phasing, equipment schedule and wiring diagram and <br /> schedule. <br /> • Details for foundation requirements (if any) for the new entry monument will be <br /> provided by the Town in a timely manner. Size and other general design <br /> requirements will be provided by the Town, including electrical requirements. <br /> • No other remedial design for existing curbs,pavement, etc. is included in the scope of <br /> this project. <br /> • The Town will provide an electronic copy of their boiler plate specifications to be <br /> used for the project. <br /> • Assistance during bidding and construction support and inspection are not included as <br /> part of this scope and will be defined as a later date. <br /> • Assumes that the existing signal controllers and electrical service equipment is <br /> adequate and will not have to be replaced. <br /> - The design cost estimate for this project is $61,402, which includes the landscaping <br /> subconsultant. In addition, we are suggesting a contingency fund of$3,000 for the cost of <br /> reproduction of the PS&E package, if the printing and distribution is handled by CSG. <br /> 1700 South Amphlett Boulevard,3r0 Floor;San Mateo,CA 94402 <br /> Phone: 650-522-2500 Fax: 650-522-2599 <br /> Email:csgstaff@csgengr.com Online at www.csgwebsite.com <br /> A <br />