Laserfiche WebLink
• <br /> r <br /> Los Alto Hills -Segment 3 Pathway Design <br /> RESOURCE ALLOCATION ESTIMATE - <br /> st <br /> 0 <br /> a <br /> c c d <br /> Task Description Tad d `0 = 0 0 •0 as c V (4 Totals <br /> C- w a. a) o Igo c w w E A C <br /> 'V C 0 C •0 c u C p) _C C d d <br /> C 'C u) 'N5) .(7) <br /> N •5 •C 5)0 cL i' E <br /> 'C C CDC WC WC QC Co ' 7 'a <br /> 0- W ,_f/) W Q W Q W Cl W W I-- N U) , < <br /> Category Notes $170 $140 $125 $110 $110 $90 $200 $75 Hours Cost <br /> TASK 1-Preliminary Design,"&Field'Surveying Services' <br /> Project setup/Management 2 2 $280 <br /> Field Surveys -_ 8 s 8 $1,600 • <br /> Reduce Field Notes/Create Base Sheets 8 8 $880 <br /> Layout/Design 8 24 8 40 $4,640 <br /> Cover Sheet 6 6 $660 <br /> Details 4 12 12 28 $3,200 <br /> Meetings 2 2 2 6 $840 <br /> Specifications 2 8 10 $1,160 <br /> Signal Mods 12 24 36 $3,840 <br /> Printing/Delivery 0 <br /> Task 1 -Subtotal 2 30 0 46 34 I 24 I 8 0 0 144 $17,100 <br /> TASK 2-Detailed Design <br /> Layout/Design 8 24 _ 32 $3,760 <br /> Structural Calcs 4 _ 4 $560 <br /> Details 4 20 8 32 $3,640 <br /> Meetings 2 2 2 6 $840 <br /> Specifications/QTO 4 4 _ 8 $940 <br /> Signal Mods 16 8 32 56 $6,000 • <br /> 0 <br /> • <br /> Task 2-Subtotal 2 34 4 50 16 32 0 0 0 138 $15,740 <br /> TASK 3'=Final Design ' ` ° ''' \ ., ¢ ' 4"" <br /> t" <br /> Layout/Design 5 10 15 $1,800 <br /> Details 12 8 20 $2,200 <br /> Meetings 0 $0 <br /> Specifications/QTO 2 2 4 $470 <br /> Signal Mods 4 4 8 $1,000 <br /> 0 $0 <br /> 0 $0 <br /> Task 3-Subtotal 0 9 2 24 12 0 0 0 0 47 $5,470 <br /> CSG Consultants,Inc. <br /> Proposal by Task(no CA) 10-24-07.xls Page 1 12/12/2007 <br />