Laserfiche WebLink
Planning Commission <br />Lands of Burger <br />September 4, 2008 <br />Page 8 of 8 <br />conditions of the project shall be described by the geotechnical consultant <br />in a letter and submitted to the Town Engineer for review prior to final <br />(granting of occupancy) project approval. <br />C. FIRE DEPARTMENT: <br />30. An automatic residential fire sprinkler system approved by the Santa Clara <br />County Fire Department shall be included in all portions of the proposed <br />building. Three sets of plans prepared by a sprinkler contractor shall be <br />submitted to the Santa Clara County Fire Department (14700 Winchester <br />Blvd., Los Gatos, CA 95032) for review and approval. The sprinklers <br />shall be inspected and approved by the Fire Department, prior to final <br />inspection and occupancy of the new building. <br />31. Approved numbers or addresses shall be placed on all new and existing <br />buildings in such a position as to be plainly visible and legible from the <br />street or road fronting the property. Numbers shall contrast with their <br />background. <br />Project approval may be appealed if done so in writing within 22 days of the date of <br />approval. The building permit cannot be issued until the appeal period has lapsed. The <br />applicant may submit construction plans to the Building Department after July 24, 2008 <br />provided the applicant has completed all conditions of approval required prior to <br />acceptance ofplans for building plan check <br />Please call 650-941-7222 extension 235 to schedule a final inspection with the Planning <br />and Engineering Departments at least two weeks prior to scheduling the final building <br />inspection approval. <br />CONDITION NUMBERS 5, 13, 17, 21, 22, 23, 24, 26, 27, AND 28 SHALL BE <br />COMPLETED, REVIEWED, AND APPROVED BY TOWN STAFF PRIOR TO <br />ACCEPTANCE OF CONSTRUCTION PLANS FOR PLAN CHECK BY THE <br />BUILDING DEPARTMENT. <br />NOTE: The Site Development permit is valid for one year from the approval date (until <br />July 17, 2009). All required building permits must be obtained within that year and work <br />on items not requiring a building permit shall be commenced within one year and <br />completed within two years. <br />