My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/30/1958
LOSALTOSHILLS
>
City Clerk
>
City Council Minutes
>
1958
>
6/30/1958
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2016 4:04:28 PM
Creation date
7/12/2016 10:24:23 AM
Metadata
Fields
Template:
Minutes
Date
1958-06-30
Description
Adjourned City Council Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2 -- <br />Hills Development Company. <br />Mr. McCandless, City Engineer, was unable to be present due illness. <br />In reference to a letter of June 241, 1958 from the Fremont Hills <br />Development Company to the Council, Par. Riley reported that an <br />agreement had been met with Mr. McCandless on the improvements re- <br />quired in Unit ,#1, and that they are waiting for inspection of the <br />other Units. He stated that the matter of a pipeline to be located <br />near the Herb Frank lot will be taken care of. <br />The City Clerk stated that Mr. McCandless will make no inspections <br />until such time as work has been completed according to specifi- <br />cations of the improvement plans. He pointed out that there is so <br />much work that has not been done, and until it is completed, the <br />City Engineer will not inspect Units 2, 3, and 4. <br />-questioned regarding incompleted work, Mr. Riley stated that he <br />would confer with the City Clerk. <br />The City Clerk stated that the City Engineer will submit a written <br />report of the status of improvements as noted dur% 'on site inspect- <br />ion' made June 30b, 1958. <br />Mr. Fitzpatrick reported that he had talked with Mr. Berger relative <br />to the Fremont Hills Development Company being permitted to improve <br />the drainage ditch on his property to take care of excess run off <br />from its subdivisions, and stated that no agreement had been reached <br />between them. <br />Councilman Treat made reference to the action of the Meeting of <br />June 23rd, stating that the purpose of postponing action was to <br />give Fremont Hills an opportunity to make some arrangement with <br />PTr. Berger or present some alternate proposal. <br />Councilman Bledsoe stated the recommendations of the City Engineer, <br />calling for the installation of a 30" pipe line running from Con- <br />cepcion and West --Fremont Avenues , running Fremont Aivenue to the <br />end of the Town Hall property to be connted to a 36" pipe line to <br />continue down to St. Francis Drive, and that a 4'x6' reinforced <br />concrete box culvert be installed across gest Fremont (Lvenue. <br />In answer to the question of whether or not Fremont Hills will a- <br />gree to the recommendations of the City Engineer of June 23rd, 19589 <br />Mr. Riley stated that they will agree to the specifications under <br />protest. <br />Councilman Clayton commented on the existent danger at West Fremont <br />and St. Francis Drive, and expressed his opinion that the Council <br />should set a time for beginning and completion of work to be done, <br />including the pipeline, culvert, and improvements of perimeter <br />roads. He further stated that if the work is not completed within <br />the specified time, the Town should take recourse under the bonds. <br />Mr. Riley asked for clarification regarding requirements of the pro- <br />posed pipeline and one complete culvert, stating that Fremont Hills <br />had formerly agreed to install '/G culvert at Fremont and Concepcion <br />
The URL can be used to link to this page
Your browser does not support the video tag.