My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.2
LOSALTOSHILLS
>
Planning Commission
>
Planning Commission Packets
>
1998
>
April 22, 1998
>
3.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2016 10:47:56 AM
Creation date
12/9/2016 10:47:53 AM
Metadata
Fields
Template:
Staff Report
Date
1998-04-22
Item Number
3.2
Description
Site Development Permit for a New Residence and Sport Court; Lands of Harari; 12580 Miraloma Way; File #268-97-ZP-SD-GD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Planning Commission <br /> April 22, 1998 <br /> Lands of Harari <br /> Page 8 <br /> Upon completion of construction, a final inspection shall be set with the Planning Department <br /> and Engineering Department at least two weeks prior to final building inspection approval. <br /> CONDITION NUMBERS 1, 2, 4,9, 13, 14, 15, 17, 18, AND 24 SHALL BE COMPLETED <br /> AND SIGNED OFF BY THE PLANNING DIRECTOR AND THE CITY ENGINEER <br /> PRIOR TO ACCEPTANCE OF CONSTRUCTION PLANS FOR PLAN CHECK BY THE <br /> BUILDING DEPARTMENT. <br /> All properties must pay School District fees to either the Los Altos School District or the <br /> Palo Alto Unified School District, as applicable, before receiving their building permit from <br /> Los Altos Hills. The applicant must take a copy of Worksheet #2 to school district offices <br /> (both the elementary and high school offices in the Los Altos School District), pay the <br /> appropriate fees and provide the Town with a copy of their receipts. <br /> NOTE: The Site Development permit is valid for one year from the approval date (until April <br /> 22, 1999). All required building permits must be obtained within that year and work on items <br /> not requiring a building permit shall be commenced within one year and completed within two <br /> years. <br />
The URL can be used to link to this page
Your browser does not support the video tag.