Laserfiche WebLink
Drainage OP(Fund 045):Drainage In-Lieu Fee Transfer($150k);Drainage CIP Balance:$415,210 <br /> El. Barron Creek(Prior Approp.$250,000) 20,000 20,000 <br /> Barron Creek drainage channel is located on private property,where the Town has an easement right.Sediments have <br /> deposited in the channel raising the original flow line.Dredging is required to restore to the original flow line <br /> elevation.The property owner has requested for the restoration to include aesthetic improvements and has agreed <br /> to improve this channel based on Town's drainage requirements while complying with planning and building code in <br /> the aesthetic improvements.The Town will reimburse the property owner up to$250,000 or 50%of channel <br /> improvement,excluding all aesthetic improvement cost.In 2015/16,$250,000 was appropriated for this purpose. The <br /> draft contract agreement is under review by both parties. Additional request of$20,000 is incidental cost,such as <br /> legal fees. <br /> E2. Matadero Creek Erosion(Prior Approp.$500,000) 50,000 ' 50,000 <br /> Repair the erosion along the edge of Page Mill Road between Baleri Ranch Road and Berry Hill Court at Matadero <br /> Creek. Due to large overall expense,lengthy permitting process and the risk of road damage,the project was divided <br /> into two phases. Phase One was completed on December 12,2012. Phase Two design has been submitted to <br /> regulatory agencies for review and permitting.Construction is scheduled to begin in FY 16/17. Staff requests <br /> additional funding of$50,000 to complete Phase Two construction. <br /> E3. Newbridge Drainage Improvement(Prior Approp.$12,200) 50,000 50,000 <br /> Newbridge Dr.has ponding water at several areas. Survey and design work were completed in March 2016. <br /> Construction is scheduled to begin in 2016/17,including new asphalt grades and drainage improvements to create <br /> positive drainage flow. Appropriation of$50,000 is required for the construction and inspection phase. <br /> E4. Annual Storm Drain Improvement Program 40,000 40,000 <br /> Designed to protect,preserve,and enhance storm drain facilities to minimize threat of flooding or extended periods <br /> of standing water during and after storm/rain events. The storm drain improvements are completed along with the <br /> annual road/pavement rehabilitation program.This approach allows the Town to save up funds to repair drainage <br /> discharge outlets and slope stability and erosion issues. <br /> Subtotal 160,000 160,000 <br /> Street CIP(Fund 046):Street CIP Rev($110k);Gas Tax Ops($156,700);Street CIP Balance:$65,682 <br /> Fl. Annual Road Rehabilitation Program 1,100,000 1,100,000 <br /> The annual road rehabilitation program is designed to maintain safe and functional Town streets.The street <br /> selections are based on recommendations from Metropolitan Transportation Commission's Pavement Management <br /> Program(PMP),field inspections,and staff judgement. Upon completion of the design phase and receipt of bids,the <br /> list of streets and type of work required are presented to the City Council for construction contract award.The goal of <br /> the project is to increase the Town's pavement condition index to 80 and above. Dawnridge Rd Pavement Rehab is <br /> schedule for replacement in 2018/19. <br /> a. Use Street CIP Balance(Balance$65,682) 65,682 <br /> b. Designate 100%of Gas Tax for Street CIP(Budget:$156,700) 156,700 <br /> c. Transfer Excess Street Ops Fund Balance(Street Ops Balance:$259,758) 103,058 <br /> d. General Fund Support 664,560 <br /> Subtotal 1,100,000 1,100,000 <br /> 7 <br /> Special Joint Meeting Minutes <br /> of the Town of Los Altos Hills City Council <br /> and the Finance and Investment Committee <br /> May 31,2016 <br />