My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/18/1986 (2)
LOSALTOSHILLS
>
City Clerk
>
City Council Minutes
>
1986
>
06/18/1986 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2016 11:48:46 AM
Creation date
7/20/2015 2:50:28 PM
Metadata
Fields
Template:
Minutes
Date
1986-06-18
Description
Reglar Meeting Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c= cWWIL. MLNUTSS - June 18, 1986 <br />F. OLD BUSINESS: Item 2 - El Monte Guardrail (continued) : <br />MOTION SECONDED AMID CAR=: Moved by Tryon, seconded by FVhrn and passed <br />unwdi sly to take the bids for the El Monte Guardrail Project under advisement <br />and to direct staff and advisory canmittees (specifically Safety and Environmental <br />Design and Protection Committees) to investigate and propose alternate solutions.. <br />3. Resolution # amending Resolution #1256 wbich adopted a policy con- <br />cerning landscaping, and setting of bonds thereof <br />The City Manager camiented that the resolution before Council revised the aurount <br />of landscape bond that may be required to guarantee the installation of landscaping. <br />He further noted that the mounts had been recoup idea by the City Engineer with the <br />concurrence of the Planning ConmLssion. <br />MOTION SEED ASID CARRIED: Moved by van Tamelen, seconded by Dronkert and passed <br />unaninously to adopt Resolution #88-86 amending Resolution #1256 which adopted a <br />policy concerning landscaping and setting of bonds thereof. Council also directed <br />that copies of the landscaping policy including staff report would be sent to the <br />Envirormiental Design and Protection Co mittee, Pathway Cmn nittee and Planning <br />Commission. <br />Item Removed frau Consent Calendar: <br />a) Resolution # awarding a contract for the Viscaino Court recon- <br />struction project <br />4Was <br />City Manager mmiennted that he had removed this item frm the Consent Calendar <br />as the bid exceeded the budgeted estimates ($50,000 appropriated; $61,590 bid plus <br />contingencies and inspection) and it would be necessary to ante d the 1989-85 budget. <br />This anrzKn t was scheduled for Council approval later in the meeting. <br />NATION SECONDED AMID CARRIED: Moved by van Tamelen, seconded by Rydell and passed <br />unanimusly to adopt Resolution #89-86 awarding a contract for the Viscaino Court <br />reconstruction project <br />NEW BUSINESS: <br />1. Request for removal of stop work notice - Land s of Keenan, 27801 Saddle <br />Court (concerning construction of wall) <br />Council had before then a report frau the Staff Planner and the Assistant City <br />Attorney, Susan St. Clair, concerning the wall on the Lards of Keenan. The report <br />rotes that the wall under construction had a stop work notice placed on it for <br />being constructed in excess of the maximum height allowed per Section 9-5.503(c). <br />The wall had received, however a zoning permit aria a building permit. The report <br />further rotes that the Council may interpret Section 9-5.503(c), fence and wall <br />height regulation; may requre the applicant to apply for a variance to allow the <br />fence or may require the structure be made to conform with the Zoning Ordinance. <br />V <br />
The URL can be used to link to this page
Your browser does not support the video tag.